(510) 555-0165 ◇ Fremont, CA
wendell.pryce@example.com ◇ linkedin.com/in/wendell-pryce ◇ wendellpryce.com
Test engineer with 7 years in hardware product validation, designing and running test programmes for consumer electronics that ship 2 million units a year. Built 14 automated test fixtures that cut production test time per unit from 90 seconds to 22, caught 3 design defects in validation that would have reached the field, and holds a 0.3% field return rate on the last 4 launched products. Testing physical products, where a miss becomes a recall.
Coursework in Circuit Design, Signals and Systems, Measurement and Instrumentation, and Embedded Systems.
Also completed a 40-hour course in design of experiments and reliability statistics in 2021.
- Own validation and production test for a product line shipping 2 million units a year across 4 products.
- Built 14 automated test fixtures that cut production test time per unit from 90 seconds to 22 at the contract manufacturer.
- Caught 3 design defects in validation that would have reached the field, and hold a 0.3% field return rate on 4 launches.
- Ran design verification on 6 products across 3 years, executing about 400 test cases per product.
- Raised first-pass production yield from 91% to 98% by tracing 5 recurring failures to test fixture tolerance rather than product defects.
- Built a data logging system across 20 test stations that made yield trends visible within a shift instead of a week.
- Automated 30 manual bench tests in LabVIEW across a 14-week internship, saving about 12 hours a week.
- Ran 200 environmental chamber cycles on 2 products and documented 4 failures to root cause.
- Built a fixture for a connector durability test that ran 10,000 cycles unattended.
Production Test Fixtures. Designed 14 automated fixtures that test power, radio, sensors, and audio in 1 station, cutting test time from 90 seconds to 22 per unit. At 2 million units a year, that removed about 38,000 hours of line time.
Validation Defect Catches. Found 3 design defects in verification, including a thermal issue that only appeared after 6 hours at the upper temperature limit, by writing test cases from the failure modes rather than from the specification alone.
Yield Recovery. Raised first-pass yield from 91% to 98% at a previous employer by measuring fixture repeatability, which showed 5 recurring failures came from the test equipment and not from the product.
- Mentor a high school robotics team of 20 students across a 12-week season.
- Serve on the committee of a regional quality engineering society chapter with about 150 members.
- Maintain an open-source instrument control library with roughly 400 monthly downloads.
- Lead a validation team of 3 and coordinate test deployment with a contract manufacturer team of 12.
- Set the design verification test standard now used across 4 product lines.
- Mentored 2 interns into full-time test engineer roles across 4 years.

.webp)



.webp)


%20Which%20Should%20You%20Use.webp)