Licensed power engineer with 9 years in generation and industrial power, currently the lead power engineer for a 620-megawatt combined-cycle generating station, responsible for electrical systems from the generator terminals to the switchyard. Holds a 99.2% equivalent availability factor over 3 years against a fleet average of 96.8%, led a generator step-up transformer replacement completed 6 days ahead of a 30-day outage window, and cut electrical-related forced outage hours 55% through a condition-based maintenance programme. Keeps 620 megawatts on the grid by knowing every relay setting, every breaker, and every operator on the floor.
Coursework in Power System Analysis, Electrical Machines, Protective Relaying, Power Electronics, and High Voltage Engineering.
Also holds a NERC system operator certification earned in 2019 and completed an arc flash and electrical safety programme in 2022.
- Lead electrical engineering for a 620-megawatt combined-cycle station with 2 gas turbines, 1 steam turbine, and a 345-kilovolt switchyard, supervising 2 engineers and 8 electricians.
- Hold a 99.2% equivalent availability factor over 3 years against a fleet average of 96.8%, and cut electrical-related forced outage hours 55% through a condition-based maintenance programme on 60 critical assets.
- Led a generator step-up transformer replacement worth $9M completed 6 days ahead of a 30-day outage window and $600K under budget, with 0 recordable injuries across 14,000 contractor hours.
- Owned the electrical distribution system for a steel mill with 180 megawatts of demand, 4 substations, and 300 medium voltage motors over 3.5 years.
- Completed an arc flash study and relay coordination across 40 switchgear lineups that cut incident energy above 40 calories per square centimetre at 25 locations to 0.
- Led a power factor correction project of 30 megavolt-amperes reactive that cut utility demand charges $1.1M a year.
- Built an ETAP model of a substation with 80 buses during a 12-week internship and validated it against 20 field measurements within 3%.
- Documented 200 relay settings and found 6 coordination gaps corrected before the next outage.
- Received a full-time offer at the end of the 12-week internship based on the ETAP model.
Generator Step-Up Transformer Replacement. Led the replacement of a 400-megavolt-ampere generator step-up transformer over 18 months of planning and a 30-day outage, managing specification, factory acceptance testing, a 280-tonne transport and rigging plan, and commissioning with 40 tests, which finished 6 days early, $600K under a $9M budget, and with 0 recordable injuries.
Condition-Based Electrical Maintenance. Built a programme on 60 critical electrical assets with online partial discharge monitoring on 12 medium voltage motors and generators, quarterly infrared and dissolved gas analysis, and a health index feeding SAP work orders, which cut electrical-related forced outage hours 55% and avoided 3 failures with an estimated $2.4M in lost generation.
Mill Arc Flash and Coordination Study. Completed an arc flash and protective device coordination study at a previous employer across 4 substations and 40 switchgear lineups, modelling 900 buses in ETAP, revising 220 relay settings, and relabelling 600 pieces of equipment, which eliminated 25 locations above 40 calories per square centimetre and cut nuisance trips 70%.
- Member of a power and energy engineering society chapter, presenting at 2 regional conferences.
- Volunteer judge for a regional high school science fair since 2019.
- Play in a recreational cricket league, about 20 matches a season.
- Lead an electrical team of 2 engineers and 8 electricians with a $3.5M annual maintenance and capital budget.
- Trained 30 operators and technicians on switching, lockout, and arc flash procedures with 0 electrical safety incidents in 4 years.
- Present availability, reliability, and project status to the plant manager weekly and the fleet engineering director quarterly.